keyword:
sort:
area:
time:
 
| news issue->Trade |
Poly Technology's First Construction Project – Sudan RUFAA Bridge
2007-09-27 09:35:57
(has been browse 3023 times)

Sudan Rufaa Bridge is over the Green Nile, the city of Rufaa, 137 km to the southeast of Khartoum, the capital of Sudan.  The bridge connects the west and east banks of the Green Nile, and interconnects the old highway from Khartoum to another important city.  The main body of the bridge is 60m+90m+60m continuous beam bridge built from pre-stressed concrete.  For approach, one side is 2x36m continuous box beam built from pre-stressed concrete; the other side is 2x36m broadened continuous box beam built from pre-stressed concrete;  one arch of 40m-long u-shaped beam crosses over the existing road; the ramp and connecting road is of asphalt concrete, 1136m long. 

The construction of Rufaa Bridge bears great significance.  It marks Poly Technology’s entry into overseas construction markets as well as the its success in exploring new business field and seeking new profit growth point while vigorously developing trade and resources.  Poly’s reputation is rising.  In addition to the construction of Rufaa Bridge, Poly Technology is negotiating the construction of Ad-Duwaym Bridge over the White Nile in Sudan which is expected to commence by the end of the year.  Besides, Sudanese side has invited the company to be further engaged in the building of bridges, civil constructions and hydropower and hydraulic engineering.
 
Total Access

Copyright(C) 1993-2007 CHINA POLY GROUP CORPORATION, All rights reserved 
Add:No.1, North Street of Chaoyangmen, Dongcheng District, Beijing, China 100010 
Tel:+86-10-65002288 Fax:+86-10-64082812